编号 zgly0001584604
文献类型 期刊论文
文献题名 1977年以来黄河临河段河岸冲淤面积变化及河道萎缩速率(英文)
作者单位 KeyLaboratoryofWaterCycleandRelatedLandSurfaceProcesses InstituteofGeographicSciencesandNaturalResourcesResearch CAS UniversityofChineseAcademyofSciences
母体文献 Journal of Geographical Sciences
年卷期 2016年11期
年份 2016
分类号 TV147
关键词 channelplanformgeometry riverbank erosion-accretionvariation channelshrinkage Linhereach braidedchannel YellowRiver
文摘内容 Quantitative studies on river channel lateral erosion/accretion area changes over time can reveal the characteristics of channel evolution. Taking the 213-km-long Linhe reach braided channel of the Yellow River as an example, area changes in channel bank erosion/accretion in four sub-reaches(S1, S2, S3 and S4) over 19 different periods were evaluated on the basis of remote sensing images captured since 1977. Mean channel shrinkage rate for the whole river reach was also obtained. Results show that the left and right banks of the Linhe reach were dominated by lateral net accretion between 1977 and 2014. The channel area of this section of the Yellow River was characterized by reduction between 1977 and 2001, while periods of alternate erosion and accretion occurred subsequent to 2001. Mean channel shrinkage rate in the Linhe reach braided channel was 6.15 km~2/yr between 1977 and 2014, while the most remarkable changes in channel planform occurred in the 1990 s. Compared to 1995, channel length and sinuosity increased by 5.8% and 6.6% by 2000, while channel area and mean width decreased by 39.4% and 42.8%, respectively. Significant changes in channel planform and shrinkage of the Linhe reach occurred in the 1990 s, mainly as a result of the joint-operation of the Longyangxia and Liujiaxia reservoirs since 1986, which caused substantial reductions in runoff and sediment flux during the annual flooding season. In addition, bank erosion/accretion in the four sub-reaches was affected by the physical properties of local banks, engineering emplaced to protect channel banks, and hydrodynamic differences. However, since the implementation of integrated river management measures from 2000 onwards, these changes have been significantly mitigated and the health of the Linhe reach braided channel of the Yellow River has been restored.